Purpose Stations Valö (1), Skalkorgarna (2), Älvsborgsbron (3), Danafjord (4), Ostindiebådarna (5), Instö Ränna (7), Stigfjorden (9), Galterö (10), Koljöfjord (11), Inre Gullmarn (12), Brofjorden (13), Åstol (14), Kosterfjorden (16), Byttelocket (17), Byfjorden (18), Havstenfjord (19), Riksgränsen (22). Frequency Time Different sampling depths Variables Particulate carbon and nitrogen (POC/PON) are measured at two different levels, 5 and 20 metres, triple tests. Result |
|
Purpose Stations Skalkorgarna (2), Danafjord (4), Galterö (10), Brofjorden (13), Inre Gullmarn (12), Kosterfjorden (16). Variables Aluminium, chromium, vanadium, nickel, copper, zinc, arsenic, cadmium, tin, lead, mercury, tributyltin, chlorinated aromatic compounds, mono/bicyclic aromatic compounds, phenol, phtalates/adipates, haloginated aliphatic hydrocarbons, EOX, EOCI, EPOCI, EOBr, EPOBr, PCB/DDT, PAH. Frequency Time Result The result has to be sent to the Association within six months of the survey. |
|
Purpose Stations The surveys are carried out at accumulation bottoms. Frequency Time Variables In addition, analysis of dioxin at Skalkorgarna, Galterö, Inre Gullmarn, Kosterfjorden. Result The result has to be sent to the Association within six months of the survey. |
|
Purpose Stations Sampling depth 0 - 0.7 m. Frequency Time Variables Comparisons between spring and autumn tests and estimates of the production potential should be carried out. The survey is made according to the drop-trap method. Result The report has to state the method used. The report has to be sent to the Association within six months of the survey. |
|
Purpose Stations Frequency Time Sampling depth Variables Result County without delay. The Association informs its members and others by fax according to the same fax list as for the mussel tests. Result within two weeks of the tests. A complete analysis within six weeks. Each year, a summary report is put together describing the year's events. The report shall take into account the existing hydrographic test levels. |
|
Purpose Stations Frequency Time Variables Profile lines perpendicular to the shoreline. Result The report has to state the method used. The report has to be sent to the Association within six months of the test. |
|
Purpose
Stations Frequency Time Variables The investigation carried out at Skalkorgarna includes PCB, Hg in cod liver and muscles. Result The knowledge and competence of the National Board of Fisheries, e.g. in Lysekil, should therefore be employed. The report has to be sent to the Association within three months of the survey. |
|
Purpose Stations Frequency Time Variables Result The report has to describe whether the levels have increased or decreased. |